Photographs from ENP jobs, grouped by the kind of plant they were taken in. Every frame is our own work — there is no stock photography on this site.
Project type 01
Turbine generator projects
Stator rewinds, insulation and wedging on turbine generators — units that had to go back together on a date somebody else had already promised.
A stator bore after rewind.Driving wedges home.Coating the bore, suited and on a respirator.Wedging, worked from inside the core.Field work, on the plant floor.
Project type 02
Hydroelectric power plant work
Hydro units in the powerhouse: rotor and stator work on machines that are often older than anyone on the floor, and still carrying the load.
Coating a hydro stator winding, tied off.A core assembly, lifted clear in the powerhouse.Scaffolded around the rotor rim.Rotor poles, in an older powerhouse.Blocking and pressing, two on the tool.
Start here
Shutting one of these down?
Tell us the machine, the
classifications and the dates. We come back with who we can put on your floor.